November 12, 2026
"New businesses have opened up along Cass Street and residents use the track daily to bike and scooter to work and school, exercise, and explore their neighborhoods," Mayor Jane Castor said in the City of Tampa's announcement on October 23 that the City's portion of the Green Spine Cycle Track is complete. The project took more than a decade, and one short FDOT segment near N. 15th Street is still to come.
Tampa's holiday season runs along the Hillsborough River, at Curtis Hixon, Armature Works, the Convention Center basin and Sparkman Wharf. For the first time, a protected bike route links North Hyde Park, downtown, Ybor City and East Tampa in one line. The west-bank Riverwalk meant to complete the riverfront loop is still under construction and won't be done until spring 2027. This season the Green Spine gets you into the core, and the existing Riverwalk and the water taxi handle the rest.
The Green Spine is a 3.5-mile, two-way bike route. Three-foot raised concrete dividers separate riders from cars. It runs east-west from North Hyde Park through downtown and Ybor City into East Tampa, as far as E. 21st Street. The last City-built piece, officially Phase 2A, covers a little more than a third of a mile on W. Cass Street between N. Howard and N. Rome avenues. Construction started in October 2025 and finished in September.
The route was already busy before that final stretch opened. The City's Eco-Counter at N. Boulevard and Cass Street recorded nearly 80,000 cyclists in 2025. By the time of the October announcement it had logged nearly 60,000 for 2026, with the year's last two and a half months still to count. The City posts the counter data publicly. The whole project cost about $8 million. Grants covered nearly 80 percent, and the remaining $1.6 million came from City funds.
One small gap remains on the east end. A segment near N. 15th Street will be finished by an FDOT contractor, likely in the spring, after its interstate work is done.
The City says the Green Spine connects with the West Riverwalk Extension at two locations. That extension is the larger project, and it's still being built. The West River BUILD program costs nearly $60 million and covers roughly three miles of roadway improvements plus two miles of new Riverwalk. In its July update, the City put construction at about 20 percent complete, with work active in five of the six segments.
| Piece of the route | Status heading into the holidays |
|---|---|
| Green Spine, City portion | Complete as of September 2026 |
| Green Spine segment near N. 15th Street | FDOT contractor, likely spring |
| West Riverwalk along UT, Plant Park to Cass Street | City's August update: expected by end of year, weather permitting |
| West Platt Street, S. Edison to S. Brevard | Street work began Nov. 4, runs through January 2027, pedestrian access maintained |
| Full West River BUILD project | Expected spring 2027 |
The University of Tampa section is the closest to opening, and the one riders will notice most. According to the City's August update, it's a nearly 2,000-foot trail, 12 feet wide, with brick bands that match the campus's historic buildings, about 65 new palm trees and at least five hammock stations. A small stretch of the original path, with stamped concrete from the early 1900s, was kept and worked into the new design. When it's finished, the plan is a continuous 12.2-mile pathway that ties the west side of the river directly to the center of the city. For current lane and road closures, the City keeps a road closures page.
Inside the core, the rules for shared rides are different. The City's shared micromobility program page says shared scooters and bikes can't be ridden on the Tampa Riverwalk, Bayshore Boulevard or 7th Avenue.
The water taxi covers the longer distances along the river. Under Pirate Water Taxi's 2026 schedule, service starts daily at 11:30 a.m. and stops include Curtis Hixon, Armature Works/Ulele and Sparkman Wharf. Hours matter for evening events. Weekday service ends at 6:30 p.m., while Friday through Sunday it runs until 9:30 p.m. Most of the season's big lighting events fall on weekends, so the boats are still running when the trees light up.
These events sit within a short walk or water-taxi hop of each other, so it helps to see them by date:
The newest stretch of the Green Spine already has a place to stop. Urban Jungalow is a vegan and gluten-free café at 1910 W. Cass Street, as That's So Tampa reported ahead of its planned opening. Owner Justin Basil told the City that the café put in a bike rack on purpose. "We intentionally installed a bike rack here because of the increase in traffic we get from, whether its cyclists, scooters, or pedestrians," he said in the Green Spine announcement.
The second stop has a deadline. Hidden Spring Aleworks in Tampa Heights will pour its last beer at the 1631 N. Franklin St. tasting room on Dec. 20, then move to a new location, the Tampa Bay Times reported. The building recently changed hands, and the brewery said in a post the Times quoted that it chose "to stay true to our craft and seek out a space aligned with our roots."
The last weekend before Christmas puts three of the season's events close together. Santa Saturday runs on the Armature Works Checkerboard Lawn from 1 to 4 p.m. on Dec. 19. The Lighted Boat Parade leaves from near Sparkman Wharf at 6:15 that evening and finishes at Armature Works, so someone already at the lawn in the afternoon is at the parade's end point. Since Dec. 19 is a Saturday, water taxi service runs until 9:30 p.m., and Armature Works/Ulele is one of the stops.
On Sunday the 20th, the last Winter Village Express of the season leaves Whiting Station, and Hidden Spring Aleworks opens its Franklin Street tasting room for the final day.
By next holiday season, the City expects the West Riverwalk to be done, with the UT stretch, the Platt and Brorein pedestrian bridges and the Tony Jannus Park overlook all open on the west bank.
The City lists Hyde Park, North Hyde Park, West Tampa, Riverside Heights, Bowman Heights, Ridgewood Park, North Franklin Street and Yellow Brick Row among the neighborhoods the West Riverwalk is meant to connect to downtown more safely and conveniently. If you own a home in one of them and want to know how being a short ride from the river affects its value, Angie Richison can walk you through it with real numbers. Request a free market analysis, and plan your holiday ride before the boat parade.
Stay up to date on the latest real estate trends.
Experience a data-driven, relationship-focused approach to real estate designed around your success.